Mini Magnetic GPS Tracker
Mini Magnetic GPS Tracker
Couldn't load pickup availability
- Free Shipping 5-8 Days
- Secure Payment
- Chat Support
Mini Magnetic GPS Tracker
This mini magnetic GPS tracker is designed for real-time location tracking, making it suitable for vehicles, pets, valuables, and personal use. Featuring compact dimensions, long battery life, and 4G connectivity, it provides accurate tracking while maintaining a discreet appearance. Its lightweight design and strong magnetic mount allow easy attachment to various surfaces without tools.
Strong Magnetic Mount
The integrated magnetic base enables quick and secure placement on any metal surface, making the tracker easy to hide when needed.

Real-Time 4G GPS Tracking
With 4G LTE connectivity, the device provides accurate real-time tracking through a compatible app, helping you monitor vehicles, pets, or valuables at any time.
Compact and Lightweight Design
Its small size and lightweight build make it suitable for discreet placement, allowing use in multiple scenarios without being noticeable.

Long Battery Life and Durability
The tracker offers up to 30 days of battery life per charge and features water resistance, ensuring reliable performance in different environments.
Versatile Usage
Suitable for cars, motorbikes, bikes, pets, kids, valuables, and luggage, this tracker offers a flexible solution for multiple tracking needs.
Key Features
- Strong magnetic base for secure attachment
- Real-time 4G GPS tracking via app
- Compact and lightweight design for discreet placement
- Up to 30 days of battery life per charge
- IP67 water-resistant construction
- Compatible with iOS and Android

Product Specifications
- Device type: Mini magnetic GPS tracker
- Weight: 1.76 oz
- Battery life: Up to 30 days
- Waterproof rating: IP67
- Connectivity: 4G LTE real-time GPS
- Dimensions: 2.36 × 1.57 × 0.79 inches
- App compatibility: iOS and Android
- Subscription: Not required
What’s Included
- 1 × Mini magnetic GPS tracker
- 1 × Charging cable
- 1 × User manual
Frequently Asked Questions
Q: Does this tracker require a subscription?
A: No, the device provides real-time tracking without any contracts or monthly fees.
Q: How long does the battery last?
A: The tracker offers up to 30 days of battery life per charge, depending on usage.
Q: Is the tracker water-resistant?
A: Yes, it features an IP67 rating, making it resistant to splashes and light rain.
Q: Can this tracker be used for pets, kids, and valuables?
A: Yes, its compact design and accurate tracking make it suitable for multiple uses.
Share
